This project involved a complete shower floor rebuild due to water intrusion and failure of the original mud bed. Our team removed the existing materials, replaced the drain system, installed a new waterproof liner, and constructed a properly sloped mud bed. The shower was finished with a full flake epoxy coating, creating a seamless, moisture-resistant surface designed for long-term performance.